Most homes run on single-phase power, with one active supply line from the street. Three-phase brings in three, which helps when you're adding several big loads, like a fast EV charger, a large solar system or ducted heating and cooling. The upgrade touches the network's connection, your meter and your switchboard, so a licensed electrician applies to the network and does the wiring, and who handles each step depends on where you live.

Find the specialist for this job

  1. Your postcode and a few quick questions
  2. We match a licence-checked local electrician who specialises in switchboard upgrades and safety switches
  3. They call you to talk it through. No obligation to go ahead.
  • Sparky Next Door certified: licence, insurance and the jobs they do, checked
  • One specialist for your kind of job, not a list of five to ring around
  • Only the electrician who takes your job gets your contact details
A row of circuit breakers marked 240/415 V with red, yellow and blue sleeved cables below, inside a grey metal panel.
Photo: ranjeet . on Pexels

Updated 29 October 2026 · Written by the Sparky Next Door team · How we check our facts

Do you actually need it?

Three-phase earns its place when the house needs more power than a single-phase supply comfortably carries, or when your network's rules favour it. The usual triggers are a wall charger above 7 kW, a big solar system you want to export from, ducted electric heating and cooling, a pool and spa, or a workshop with heavy machines.

It isn't always the answer. Western Power says a 7 kW single-phase EV charger is allowed on a standard home connection, as long as the contractor checks the total load stays within the supply limit. A good electrician does a load assessment first, then tells you whether three-phase, a bigger single-phase supply or smarter control of your big appliances suits your plans. The physics, in plain English, is in three-phase power explained.

Single-phase or three-phase: what changes

Single-phaseThree-phase
Supply into the homeOne active lineThree active lines
Solar export on Ausgrid's flexible optionUp to 10 kWUp to 30 kW
Standard supply on Western Power's main grid63 amps32 amps per phase
Evoenergy's advice for a home EV charger over 7 kWUpgrade to three-phase recommendedAlready suited
Solar export limit on Evoenergy's network5 kVA5 kVA on each phase, which is why three-phase can soften the limit

Who applies to the network, state by state

How it's lodgedWhat to expect
NSW: Endeavour EnergyOnline, through Endeavour's Connections PortalA Level 2 Accredited Service Provider usually does the service work, and your retailer sets up the meter
NSW: AusgridA connection application, which Ausgrid recommends your electrician completesService line work is done by a Level 2 ASP holding Ausgrid's own authorisation, and metering changes go through your retailer
VIC: CitiPower and PowercorOnly by a Registered Electrical Contractor, through eConnectAll works need a Certificate of Electrical Safety
VIC: JemenaThrough the Jemena Electricity Portal, with an Electrical Works RequestFrom 1 July 2026, going to three-phase up to 100 amps counts as a basic connection alteration
VIC: United EnergyThrough its myEnergy portal, ideally by your electrician or Registered Electrical ContractorEvery alteration goes through the same portal
QLD: EnergexBy your licensed electrician, as an Electrical Work RequestThe request also tells your retailer about the change
WA: Western PowerBy a registered electrical contractor, after a preliminary noticeWestern Power confirms three-phase is available first, then the disconnection and reconnection takes 5 to 7 weeks
SA: SA Power NetworksBy your electrician, as a connection modificationA technical assessment and maybe a site visit, then the electrician books the work. Meter changes go through your retailer
TAS: TasNetworksBy a licensed electrical contractor, through the Connections PortalThe installation is brought up to current rules first, often including low service line clearances
ACT: EvoenergyThrough a Basic Design ApplicationUp to 8 to 10 business days for a design, and up to 25 for a proposed connection date

For Essential Energy, AusNet Services, Ergon Energy, Horizon Power and Power and Water, we haven't confirmed the steps, so your electrician should check with the network before quoting.

What changes at your place

On the network side, the service line from the street may be replaced so all three phases reach your property, and the meter is swapped for one that measures three phases. On most networks your retailer arranges the meter, though CitiPower and Powercor own and manage the meters on theirs.

In the meter box, the switchboard needs a three-phase main switch and room to spread circuits across the phases so the load is balanced, and older boards are often replaced at the same time. Western Power requires a main switch circuit breaker whenever circuit capacity is added to an existing home.

In Victoria, new consumer mains (the cable from the connection point to your main switch) are prescribed work, so a licensed electrical inspector checks them before they're switched on. New South Wales issues a CCEW and Queensland a certificate of testing and compliance. In Western Australia, notifiable work also needs a notice of completion lodged with the network within 3 days of finishing.

What's on you, and what's licensed work

You can

  • List every big load you're planning for the next few years: charger, solar, battery, heat pump, induction, pool.
  • Call your retailer about the meter when the electrician says it's time.
  • Plan around the power being off for the changeover.
  • Keep trees clear of the overhead service line, using an authorised contractor near the lines.

Leave to a licensed electrician

  • The load assessment and the network application.
  • New consumer mains, the main switch and the switchboard.
  • Moving circuits across the three phases.
  • In New South Wales, the service line and connection, by a Level 2 Accredited Service Provider.

Questions to ask before you commit

  • Is three-phase available at my property, and have you checked with the network?
  • Would a bigger single-phase supply or load management do the job instead?
  • Who lodges the application, and who books the meter change?
  • In NSW, who's doing the service line work, and are they authorised for my network?
  • Does my switchboard need replacing, and is that in the quote?
  • How long is the network's wait, and how long will we be without power?

Our honest take

We'd only go three-phase with a load assessment in hand that shows single-phase can't carry what you're planning. If it can, a well-chosen single-phase charger and some load control is often the simpler path. If it can't, we'd have the switchboard, the charger circuit and the phase upgrade quoted as one job by an electrician who does them regularly, so the meter box is only worked on once.

Want a specialist to sort it?

Tell us the job and your postcode. We match the licence-checked local electrician who does this kind of work, and they call you. No ring-around, and your number goes to them alone.

Get matched

Questions

Straight answers.

How long does a three-phase upgrade take?

It depends on the network more than the electrician. Western Power puts the disconnection and reconnection at 5 to 7 weeks after it confirms availability and accepts the application. Ask your electrician for the current wait on your network before you order equipment.

Do I need three-phase for an EV charger?

Not always. Plenty of homes charge on single-phase, and Western Power allows a 7 kW single-phase charger on a standard connection if the load fits. Evoenergy recommends three-phase for chargers over 7 kW. EV charger installation covers the choice.

Will three-phase let me export more solar?

On some networks, yes. Ausgrid's flexible option allows a three-phase home to export far more than a single-phase one, and Evoenergy's limit applies per phase. Export rules are changing on several networks, so check the current ones with your solar installer.

Can any electrician do the upgrade?

The wiring in your home needs a licensed electrician. On CitiPower and Powercor only a Registered Electrical Contractor can apply, and in New South Wales the service line side needs a Level 2 electrician. Match with someone who does phase upgrades, not just general work.

Ready for a sparky?

Your postcode and a few quick questions, and we look for the licence-checked local specialist for your job.

Where this information comes from

Rules change, so check with your state regulator if something matters to your job. How we write and check these pages.

Get matched with a sparky