Leppington, right now
A growth centre since 2004
Leppington became part of Sydney's South West Growth Centre in 2004. The NSW Government has finalised detailed planning for stages 1, 2 and 5 of Leppington.
Austral and Leppington North
The neighbouring precinct is planned for up to 17,350 homes, a major centre and the new Leppington station.
Two councils, one network
Leppington sits in Camden and Liverpool councils, both in Endeavour Energy's area. Faults: 131 003.
First stage of solar changes
2179 is in stage 1 of Endeavour's flexible exports rollout from 2 November 2026.
Homes
In 2021, 95.1% were separate houses; 49.9% were mortgaged and 24.8% rented.
Upgrading the supply on a bigger property
Add up what you'll run
Sheds, pumps, workshops and EV chargers all count. An electrician totals the load first.
Single or three phase
Endeavour's basic connection offers cover up to 100 amps single phase or 63 amps three phase.
Apply through Endeavour
Changing from single to three phase is lodged through Endeavour's online Connections Portal, and many basic jobs get instant permission to connect.
Service work and the meter
A Level 2 Accredited Service Provider usually does the service work, and your retailer sets up the meter.
Our take for Leppington
If you're on a bigger block and three phase is on the table, decide before you install the charger, battery or workshop gear. Doing the supply first means every later job connects to something that can carry it. We'll match you with a licence-checked electrician who does supply upgrades if we have one near Leppington.