Electricians in DuncraigBuilt in the 1970s, and the poles are staying.

Most of Duncraig went up in the mid-1970s, and its streets still run on overhead power lines. Western Power has told the City of Joondalup that's unlikely to change for another 10 to 15 years. So the useful jobs here are about keeping a 1970s house safe on the network it has: the switchboard, the load of newer appliances, and knowing who to call when a storm hits. We'll find you one licence-checked electrician who does that work, where we have one.

Need a sparky in Duncraig?

  1. Your postcode and a few quick questions
  2. We match a licence-checked local electrician who specialises in your kind of job
  3. They call you to talk it through. No obligation to go ahead.
  • Sparky Next Door certified: licence, insurance and the jobs they do, checked
  • One specialist for your kind of job, not a list of five to ring around
  • Only the electrician who takes your job gets your contact details

Updated 29 October 2026 · Written by the Sparky Next Door team · How we check our facts

Line down or sparking after a storm?

Treat it as live and keep everyone at least 8 metres back. Call 000 if anyone's in danger, then Western Power on 13 13 51. Nobody, including an electrician, should go near it until Western Power has made it safe.

Duncraig in brief

A mid-1970s suburb

The land was mostly undeveloped until the 1960s. The bulk of Duncraig was built in the mid-1970s, with schools and the library opening from 1974.

Overhead lines for years yet

A City of Joondalup council motion in August 2025 described Duncraig as one of the older southern suburbs still served by overhead lines. Western Power advised the existing network has at least 10 years of expected life left.

Family homes, mostly owned

At the 2021 Census, 91.8% of occupied homes were separate houses and 68.2% had four or more bedrooms. 41.2% were owned outright and only 11.9% were rented.

Solar in 6023

The Clean Energy Regulator counts 3,901 small-scale solar systems in postcode 6023, with 433 solar batteries recorded from July 2025 to September 2026.

Why overhead lines matter to you

Wind and branches are the weak point. The state's underground power program started in 1996 because a severe storm in 1994 caused major disruption, and Western Power later put 80 per cent of the failures down to trees and branches falling on lines.

If the line into your house sags, sparks or pulls away from the wall, keep clear and report it to Western Power. From the meter box inwards, the wiring and switchboard are a job for a licensed electrician.

The board in a 1970s house

A board from the mid-1970s may still have rewireable fuses and one safety switch, or none. WA expects at least two RCDs covering every power point and lighting circuit before a home is sold, and on Western Power's network, adding circuits means a circuit breaker main switch.

Big houses also draw more. Ducted cooling, a pool pump and a second fridge running together on a hot afternoon is when a tired board shows its age. Western Power's standard supply is 63 amps on single phase, and the contractor has to apply for more if new load would go past it.

If we lived in Duncraig

We'd plan as if the poles are staying, because for at least a decade they are. That means a switchboard with full safety switch protection now, rather than waiting on an underground project, and 13 13 51 saved in every phone in the house.

Want a specialist to sort it?

Tell us the job and your postcode. We match the licence-checked local electrician who does this kind of work, and they call you. No ring-around, and your number goes to them alone.

Get matched

Questions

Straight answers.

Can Duncraig go underground sooner if residents pay?

The City of Joondalup has looked at it. Without Western Power's funding, the option would be a Retrospective Underground Project, and in August 2025 the City said a financially viable path ahead of Western Power's timeline was unlikely.

What should I look for on a 1970s switchboard?

Fuses or circuit breakers, how many safety switches there are, and whether the backing board is dark and bituminous. Black or dark brown boards made before 1987 can contain asbestos, so leave it alone and mention it when you book.

Ready for a sparky in Duncraig?

Your postcode and a few quick questions, and we look for the licence-checked local specialist for your job.

Where this information comes from

Rules change, so check with your state regulator if something matters to your job. How we write and check these pages.

Get matched with a sparky