Switchboard upgrades in PerthWhat Western Power and WA law add to the job.

Suburban Perth spread outward from the 1950s, and a post-war or ranch-era house that still has its original board may have fuses, no safety switches and a backing board old enough to contain asbestos. An upgrade fixes the protection and makes room for air con, solar or a charger. In WA it's licensed work from start to finish, and it ends with an Electrical Safety Certificate.

Find the specialist for this job

  1. Your postcode and a few quick questions
  2. We match a licence-checked local electrician who specialises in switchboard upgrades and safety switches
  3. They call you to talk it through. No obligation to go ahead.
  • Sparky Next Door certified: licence, insurance and the jobs they do, checked
  • One specialist for your kind of job, not a list of five to ring around
  • Only the electrician who takes your job gets your contact details
A row of white circuit breakers with black switches in an open switchboard, with blue neutral cables below.
Photo: Mark Kats on Unsplash

Updated 29 October 2026 · Written by the Sparky Next Door team · How we check our facts

Dark board behind the fuses? Leave it closed

Black or dark brown backing boards made before 1987 can contain asbestos, and some old fuses on them can hold the crumbly, friable kind inside the fuse carrier. In WA, any amount of friable asbestos has to be removed by a licensed asbestos removalist, and cutting, drilling or sanding asbestos with power tools is banned. Don't touch or tap at it. Mention it when you book, so the electrician can plan the removal before the new board goes in.

What a Perth switchboard job involves

The 63 amp limit

Since 11 April 2023, Western Power's standard household supply has been 63 amps on single phase, or 32 amps per phase on three phase. If new circuits would take the house past that, the electrical contractor assesses the demand and applies for an upgraded supply.

A circuit breaker as the main switch

When circuit capacity is added to an existing home, Western Power requires a main switch circuit breaker. On an old fuse board, that one requirement can turn a small addition into an upgrade.

The meter is Western Power's job

Western Power is fitting more than 1.2 million advanced meters by mid 2027, using its own technicians, with the power off for about 30 minutes. Your electrician works on the board side of it.

Selling or renting

Before a title transfers, safety switches must protect every power point and lighting circuit, and two is the minimum. Landlords need them in the switchboard too.

Going to three phase

A registered electrical contractor lodges a preliminary notice and applies to Western Power once it confirms three phase is available. The changeover then takes 5 to 7 weeks after the application is accepted.

Room for what's coming next

A lot of Perth upgrades now are driven by what's being added: ducted cooling for the heat, an induction cooktop, a battery, a car charger. Under Western Power's 2026 rules, a home can have up to 30 kVA of solar and battery inverter capacity, with a 15 kVA limit on a single phase connection. A 7 kW EV charger is allowed on a standard connection, provided the total load stays inside the supply limit.

So give the electrician the whole plan before they quote. Space for extra breakers is easy to leave now and hard to find later, and a board sized once is better than a board done twice. Switchboards for solar and EV chargers goes deeper on that.

The paperwork in WA

If the job is notifiable work, the contractor lodges a preliminary notice with Western Power before starting and a notice of completion within 3 days of finishing, through the eNotice portal.

Then you get an Electrical Safety Certificate within 28 days of the work being finished, and only a licensed electrical contractor can issue one. The certificate form asks whether at least two safety switches protect all power point and lighting circuits. If yours doesn't turn up, Building and Energy says to ask the contractor, then tell Western Power.

Questions for a Perth electrician before you say yes

  • Will the house stay within the 63 amp supply once everything's added, or do you need to apply for more?
  • Is a circuit breaker main switch included in this quote?
  • How many safety switches, and which circuits will each one protect?
  • If the backing board looks like asbestos, who removes it, and when?
  • Who lodges the notices with Western Power, and when will the certificate arrive?
  • What's your EC licence number, and the EW number of whoever does the work?

Where we'd start

If you're selling in Perth, we'd sort the safety switches first, because settlement depends on them. If you're staying put, we'd list everything you might add over the next few years, from air con to a charger, and ask for one board sized for all of it. Either way, we'd match with an electrician who does switchboards every week and check their EC number before they start.

Want a specialist to sort it?

Tell us the job and your postcode. We match the licence-checked local electrician who does this kind of work, and they call you. No ring-around, and your number goes to them alone.

Get matched

Questions

Straight answers.

Do I need a new switchboard to sell my house in Perth?

Not necessarily a new board, but safety switches must protect every power point and lighting circuit before the title transfers, with at least two. If your board still runs on fuses or has no room for them, an upgrade may be the simplest way to get there.

My Perth rental has no safety switches. What can I do?

Ask the landlord in writing. If nothing happens, you can send Building and Energy a copy of the request, the rental agreement and a photo of the switchboard, and an inspection and an order to the owner may follow.

How can I tell if my board might be asbestos?

Open the meter box door only and look. If the board behind the fuses is black or dark brown and the house was built before 1987, treat it as possible asbestos, don't touch it, and tell the electrician. Asbestos switchboards explains what happens next.

Ready for a sparky in Perth?

Your postcode and a few quick questions, and we look for the licence-checked local specialist for your job.

Where this information comes from

Rules change, so check with your state regulator if something matters to your job. How we write and check these pages.

Get matched with a sparky